M.C. Welding Logo   Welding Helmut
   
MORE LINKS

PRODUCTS
PRODUCTION WELDING
TOOL STEELS
  • Titanium
  • Stainless Steel
    HYDRAULIC FLUSHING
    SANITARY WELDING
  • COMPLETED PROJECTS


    GRANVILLE STREET BRIDGE
    Seismic upgrade, bridge jacking and removal of existing steel rocker bearings. Install new bearings.


    OAK STREET BRIDGE
    Deck replacement, revamp hand railings, lampstandards and catch basins.


    HOPE BRIDGE
    Seismic upgrade, welding of stiffeners and seismic jackets (pier cans).


    BALLANTYNE RESTORATION
    Restoration of marine terminal (historic site). Two year project involving the construction of temporary false work and pipe pile welding.


    PITT RIVER BRIDGE
    Abatement upgrade, installation of new bearing and beam stiffeners.

    CN TRAIN BRIDGE
    Construction of new bridge, (coffer dam construction welding and pier piling splices).
    PICTURE GALLERY
    Click on images to get the complete story.

    PATULLO BRIDGE SEISMIC UPGRADE

    Before After MC Welding installed and upgraded the Patullo Bridge to seismic specifications while traffic rolled overhead.


    NILE CREEK BRIDGE

    Butt Welds Pier Columns MC Welding was brought in to repair the welds to requirements of the Ministry of Highways and Canadian Welding Bureau.


    ISLAND MONARCH

    Island Monarch Structural steel and shell material of the bow, were replaced on the Island Monarch.


    PT36

    Island Monarch Fuel barge specially designed to service ships in port. This PT36 was a marine cargo barge converted to fuel barge.
    MORE COMPLETED PROJECTS


    DEAS SLOUGH BRIDGE
    Reinforcements to structural steel and replacement of bridge deck. All welding to Canadian Welding Bureau standards.

    LOUGHEED HIGHWAY H.O.V. LANE OVERPASS
    Welding H-piles to Canadian Welding Bureau standards.

    SURREY SKYTRAIN EXTENSION
    Bearing installation and welding to Canadian Welding Bureau standards.

    ROCK CREEK BRIDGE
    Replacement of bridge deck stud welding seismic upgrade

    QUEENSBOROUGH BRIDGE
    Installation of seismic cans, weather seals and expansion joints, Seismic upgrade

    SECOND NARROWS BRIDGE
    Installation of expansion joints and weather seals

    JOHNSTON MARINER OVERPASS
    Construction of main bridge piers, construction of temporary support structure for demolition, demolition of collapsed bridge deck, constuction of new false work.